nday
CVE-2026-98749

tty: serial: max3100: shut down timer before freeing port

Linux / Linux

Disclosed . nday has no fix record for it yet; that does not mean no patch exists. None of the four PoC sources lists it. Not in CISA KEV.

tags productLinux kernel product typeoperating system
why these tags

nday derives these tags by fixed rules from the facts below; NVD, the CNA and other sources do not assign them. Vocabulary and rules: ~/tags.

Linux kernel
affected products in the CVE record: Linux · Linux
operating system
affected products in the CVE record: Linux · Linuxthe product type of Linux kernel in nday's product registry
stage
DIS
disclosed
cvss
no score yet

Lifecycle

x axis UTC; dot = exact minute, wide bar = date only, hollow = unknown or inferred.
time unknown
DISdisclosed
10-18T15:47Z
PATpatch
no record yet
ANAanalysis
no record yet
POCPoC
no record yet
ITWexploited
no record yet
KEVKEV
no record yet

Summary

In the Linux kernel, the following vulnerability has been resolved:

tty: serial: max3100: shut down timer before freeing port

max3100_shutdown() stops the polling timer but returns early during system suspend. If the SPI device is unbound before resume, the serial core does not call max3100_shutdown() again, so max3100_remove() frees the port while the timer remains armed. max3100_timeout() may then access the freed port and re-arm the timer.

Add final timer teardown to max3100_remove() and use timer_shutdown_sync() to prevent a racing callback from re-arming it. Also free the IRQ and destroy the workqueue there before freeing the port. Keep timer_delete_sync() in max3100_shutdown() so that a subsequent open() can re-arm the timer.

The workqueue is created before request_irq() and destroyed on both request_irq() failure and normal shutdown. Its presence at remove thus identifies the IRQ left registered when suspend bypasses shutdown.

Free the IRQ before destroying the workqueue, in both max3100_shutdown() and max3100_remove(), and cancel the pending work in between. free_irq() waits for a running interrupt handler to finish and no new handler can start afterwards, so a racing handler cannot queue work on a workqueue that is being destroyed; the force_end_work check in max3100_dowork() only narrows that window, as a handler delayed between the check and queue_work() could still run after the teardown has cleared the workqueue pointer. Cancelling the work also keeps destroy_workqueue() from waiting on a queued work item in case remove() ever runs while the freezable workqueue is still frozen, e.g. device removal during the resume window, before workqueues are thawed.

This issue was found by an in-house static analysis tool.

Original text of the CVE record (cvelist), shown as published.

Event log

+DISdisclosed

CVE record published by Linux.

src cvelist · nday , bulk import · raw
{
  "id": 458033,
  "type": "disclosed",
  "source": "cvelist",
  "url": "https://www.cve.org/CVERecord?id=CVE-2026-98749",
  "occurred_at": "2026-10-18T15:47:34.347Z",
  "observed_at": "2026-11-13T05:40:20.493151Z",
  "is_backfill": true,
  "dedupe_key": "",
  "detail": {
    "state": "PUBLISHED",
    "date_published": "2026-10-18T15:47:34.347Z",
    "assigner_short_name": "Linux"
  }
}

Report an error

report an error or omission

Something on this page wrong or missing? Tell the editors; if they accept it, this page's revision log says so publicly. Upstream data is not changed.

Researcher discussion

0 researchers mentioned this in the last 7 days

Posts on X by researchers on nday's list that mention this CVE, shown as posted. nday does not check them.

nday has not collected any post on X by listed researchers that mentions this CVE.

Discussion

0 comments

No comments yet.